A blog about the mission work going on around the world by members of the Gassaway Baptist Church located in Gassaway, WV.
Showing posts with label Marshall Frame. Show all posts
Showing posts with label Marshall Frame. Show all posts
Thursday, June 20, 2019
Day 4 | Marshall Frame
When I got to the worksite today I started by caring tools upstairs. Then I measured out door molding. Then once it was cut I installed it. Then I had to go back and had to do the same to the tops of the doors. Then I went the measured baseboards. Then once they were cut I put then in place but did not installed them because so where cut wrong.
Wednesday, June 19, 2019
Day 3 | Marshall Frame
Today when I first got to the work site we stared setting up saws. Then I started marking door facings and get their measurements. Then once they were cut I used an air gun to nail them back on the door jams. Then I measured the bed rooms and closets foe base boards. then after lunch the boards where cut I got to nail them down
Tuesday, June 18, 2019
Day 2 | Marshall Frame
I got to wetness to my crew leader today. I talked about my accident back in 2007 and how it changed my life. I also got to finish the kitchen cabinets. We had to us a table saw to rip spacers to fill in a gap on the cabinets.
Subscribe to:
Posts (Atom)