Pages

Tuesday, June 18, 2019

Day 2 | Kalyn Harris

Today we went back to yesterday’s job site and finished shoveling the last 4 tons of sand. After that, we tried four different methods to construct the flowerbeds. The other youth and I got to dig trenches with hammers to lay the boards in while the adults debated on how to build them. Then, we raked sand and covered that evenly with top soil (it was really manure). After that, we planted flowers and raked mulch over that. Although the work was hard and tiring, it was a really fun day.

No comments:

Post a Comment